Kung Long Lead Acid Batteries

Our range of products include long 12v 2ah sealed lead acid battery, long 6v 7ah sealed lead acid battery and long sealed lead acid battery, wp1223a.

Long 12V 2Ah Sealed Lead Acid Battery

Request Callback

₹ 2285 / Piece Get Latest Price

Product Brochure
Battery Voltage12V
Sealed TypeSLA
Usage/ApplicationFor Medical Equipment
Dimension150*20*90
Warranty1 Year
Termination TypeF1
Operating Temperature-15 to 40 degree celsius

Minimum order quantity: 100 Piece

Product Title: Long 12V, 2AH Sealed Lead Acid Battery, WP2-12

Brand Name: Long

Model No: WP2-12

Voltage: 12V

Capacity: 2 AH

Dimension in mm.(L*W*H):  150*20*90

Weight: 0.73 kg

Carton Quantity: 20 Nos.

Certifications:  UL-recognized.

Product description:  The Long WP2-12 is a 12V, 2Ah sealed lead-acid battery built for dependable, low-maintenance power in small devices. Its spill-proof design ensures safe operation in any orientation, making it ideal for use in medical equipment and backup systems.

Applications: Medical Equipment

 

Stock Position: This Battery is normally stocked by us.

Long 6V 7AH Sealed Lead Acid Battery

Request Callback

₹ 1685 / Piece Get Latest Price

Product Brochure
Battery Voltage6V
Voltage6V
Warranty1 Year
Dimensions151*34*100
Weight1.23 Kg
ColorBlack

Minimum order quantity: 150 Piece

Product Title: Long 6V, 7AH Sealed Lead Acid Battery, WP7-6

Brand Name: Long

Model No: WP7-6

Voltage: 6V

Capacity: 7AH

Dimension in mm.(L*W*H):  151*34*100

Weight: 1.23 kg

Carton Quantity: 10 Nos.

Product description:  The Long WP7-6 is a sealed, maintenance-free battery designed for reliable performance in medical devices, UPS and many other applications. It is spill-proof, offering flexibility in installation and can be used in any orientation.

Applications: Medical equipment, UPS, Weighing Scales

Stock Position: This Battery is normally stocked by us.

 

Long Sealed Lead Acid Battery, WP1223A

Request Callback

₹ 2395 / Piece Get Latest Price

Product Brochure
Voltage12V
Battery Voltage12V
Capacity8 Ah
BrandLong
Usage/ApplicationEmergency Light
Warranty1 Year
Battery TypeSMF
Filled Weight0.714 Kg
Model Name/NumberWP1223A
Dimension182 x 24 x 61 mm
Sealed TypeSMF

Minimum order quantity: 100 Piece

Product Title: Long 12V, 2.1AH Sealed Lead Acid Battery, WP1223A

Brand Name: Long

Model No: WP1223A

Voltage: 12V

Capacity: 2.1AH

Dimension in mm.(L*W*H):  182*24*61

Weight: 0.71 kg

Carton Quantity: 10 Nos.

Certifications:  UL-recognized.

Product description:  The Long WP1223A is a special-purpose maintenance free battery which is specially designed for use in medical equipment and video recording devices. The battery is maintenance free, and therefore is spill-proof and can be used in any position.

Applications: Medical Electronics, Video Recording Devices.

Stock Position: This Battery is normally stocked by us.

Keywords: 12V 2.1AH, 2.1AH, 12V battery, sealed maintenance free, lead acid, sealed lead acid, WP1223A battery, WP1223A, Long Battery, Long 12V 2.1AH

X

Contact Us

Tarun Desai (CEO)
Prime Products
1st, C-107, Synthofine Estate, Off Aarey Road, Goregaon East
Mumbai - 400063, Maharashtra, India

Get Directions
Send Email
Share:
Thank youYour Enquiry has been sent successfully.